{"id":556,"date":"2013-09-11T18:39:02","date_gmt":"2013-09-11T15:39:02","guid":{"rendered":"http:\/\/www.borbolycsaba.ro\/ro\/?p=556"},"modified":"2013-09-16T18:40:02","modified_gmt":"2013-09-16T15:40:02","slug":"asfaltare-pe-drumul-spre-bilbor","status":"publish","type":"post","link":"https:\/\/www.borbolycsaba.ro\/ro\/asfaltare-pe-drumul-spre-bilbor\/","title":{"rendered":"Asfaltare pe drumul spre Bilbor"},"content":{"rendered":"<p style=\"text-align: justify;\">\u00cen toamna acestui an pe drumul jude\u021bean 174A, dinspre comuna Bilbor spre DN15, 2,3 kilometri vor fi asfalta\u021bi din cei 5,8 kilometri neasfalta\u021bi, de la sf\u00e2r\u0219itul covorului asfaltic existent. Achizi\u021bia public\u0103 pentru efectuarea lucr\u0103rilor pe aceast\u0103 por\u021biune a fost \u00eencheiat\u0103, iar contractul se va semna\u00a0 \u00een cur\u00e2nd cu firma c\u00e2\u0219tig\u0103toare. Consiliul Jude\u021bean Harghita, \u00een \u0219edin\u021ba ordinar\u0103 din 20 iunie 2013, a aprobat documenta\u021bia de avizare a lucr\u0103rilor de interven\u0163ii pentru investi\u0163ia \u201eModernizare drum jude\u021bean DJ 174A, Bilbor \u2013 DJ 174C \u2013 lim. jud. Suceava\u201d, iar valoarea reabilit\u0103rii pe por\u021biunea de 2,3 kilometri este de 1.620.000\u00a0lei, din care 1.000.000 lei sunt alocate de guvern \u00een cadrul Programului Na\u021bional de Dezvoltare Local\u0103 \u0219i restul din bugetul jude\u021bului.<\/p>\n<p style=\"text-align: justify;\">Borboly Csaba, pre\u0219edintele consiliului jude\u021bean consider\u0103 c\u0103 aceast\u0103 investi\u021bie reprezint\u0103 o realizare\u00a0 important\u0103 pentru locuitorii zonei, \u0219i\u00a0 nu numai, deoarece prin reabilitarea integral\u0103 a drumurilor jude\u021bene 174A \u0219i 174C se va face o leg\u0103tur\u0103 direct\u0103 \u00eentre Bucovina \u0219i Transilvania, ceea ce poate \u00eensemna dezvoltare economic\u0103 \u0219i turistic\u0103 pentru ambele regiuni, iar distan\u0163a \u00eentre Suceava \u015fi Bra\u015fov ar deveni mai scurt\u0103 cu 110 kilometri. \u201e\u00cemi pare r\u0103u pentru faptul c\u0103 locuitorii din Bilbor trebuie s\u0103 c\u0103l\u0103toreasc\u0103 pe o por\u021biune de drum neasfaltat, dar acest lucru se va schimba, facem tot posibilul ca s\u0103 putem moderniza \u0219i restul drumului, prin atragerea fondurilor guvernamentale. \u00cent\u00e2rzierile \u00een demararea lucr\u0103rilor se datoreaz\u0103 \u0219i faptului c\u0103 au existat probleme de-a lungul procedurii de achizi\u021bie public\u0103, iar c\u00e2t prive\u0219te firma care a c\u00e2\u0219tigat ini\u021bial lucr\u0103rile de execu\u021bie, colaborarea cu aceasta a fost anevoioas\u0103. \u00cemi cer scuze pentru faptul c\u0103 at\u00e2t locuitorii din Bilbor, c\u00e2t \u0219i autovehiculele\u00a0 au avut de suferit din pricina drumului. Au fost\u00a0 \u00eentreprinse toate demersurile, \u00eens\u0103 nu a fost g\u0103sit\u0103 o cale de rezolvare a situa\u021biei. Ceea ce s-a realizat p\u00e2n\u0103 \u00een momentul de fa\u021b\u0103 se datoreaz\u0103 \u0219i implic\u0103rii Prefecturii jude\u021bului Harghita \u0219i reprezentantului zonei, ministrul de interne Mircea Du\u0219a\u201d, a declarat pre\u0219edintele. El a amintit c\u0103 \u00een anul 2011 s-a \u00eent\u00e2lnit cu pre\u0219edintele de atunci al Consiliului Jude\u021bean Suceava, Gheorghe Flutur, la Pasul Iute\u015f, l\u00e2ng\u0103 comuna Bilbor, la grani\u0163a dintre cele dou\u0103 jude\u0163e \u0219i s-au \u00een\u0163eles c\u0103 turismul s-ar putea dezvolta \u00een colaborare, deoarece un pachet de oferte turistice comune ale Harghitei \u0219i Sucevei ar \u00eensemna o concuren\u0163\u0103 puternic\u0103 pentru Valea Prahovei.<\/p>\n<p style=\"text-align: justify;\">Categoriile de lucr\u0103ri propuse pentru executare pe por\u021biunea de 2,3 kilometri sunt: desfacere funda\u0163ii existente sau pavaje, executare strat funda\u0163ie din balast 15 cm, strat de piatr\u0103 spart\u0103 15 cm, strat de leg\u0103tur\u0103 5 cm BAD 25, strat de uzur\u0103 4 cm din BA 16, acostamente balastate 2&#215;1 m \u0219i lucr\u0103ri de evacuare a apelor (pode\u0163e \u015fi \u015fan\u0163uri). Lucr\u0103rile vor fi \u00eencepute la km 34+100, dinspre localitatea Bilbor, \u00een direc\u021bia DN15.<\/p>\n<p style=\"text-align: justify;\">Drumurile jude\u0163ene 174A \u015fi 174C se \u00eentind pe o por\u0163iune de 30 de kilometri \u00een jude\u0163ul Suceava \u015fi 31 de kilometri \u00een Harghita.<\/p>\n<p style=\"text-align: justify;\">Miercurea-Ciuc, 11 septembrie 2013<\/p>\n<div class=\"pvc_clear\"><\/div>\n<p id=\"pvc_stats_556\" class=\"pvc_stats all  \" data-element-id=\"556\" style=\"\"><i class=\"pvc-stats-icon medium\" aria-hidden=\"true\"><svg aria-hidden=\"true\" focusable=\"false\" data-prefix=\"far\" data-icon=\"chart-bar\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 512 512\" class=\"svg-inline--fa fa-chart-bar fa-w-16 fa-2x\"><path fill=\"currentColor\" d=\"M396.8 352h22.4c6.4 0 12.8-6.4 12.8-12.8V108.8c0-6.4-6.4-12.8-12.8-12.8h-22.4c-6.4 0-12.8 6.4-12.8 12.8v230.4c0 6.4 6.4 12.8 12.8 12.8zm-192 0h22.4c6.4 0 12.8-6.4 12.8-12.8V140.8c0-6.4-6.4-12.8-12.8-12.8h-22.4c-6.4 0-12.8 6.4-12.8 12.8v198.4c0 6.4 6.4 12.8 12.8 12.8zm96 0h22.4c6.4 0 12.8-6.4 12.8-12.8V204.8c0-6.4-6.4-12.8-12.8-12.8h-22.4c-6.4 0-12.8 6.4-12.8 12.8v134.4c0 6.4 6.4 12.8 12.8 12.8zM496 400H48V80c0-8.84-7.16-16-16-16H16C7.16 64 0 71.16 0 80v336c0 17.67 14.33 32 32 32h464c8.84 0 16-7.16 16-16v-16c0-8.84-7.16-16-16-16zm-387.2-48h22.4c6.4 0 12.8-6.4 12.8-12.8v-70.4c0-6.4-6.4-12.8-12.8-12.8h-22.4c-6.4 0-12.8 6.4-12.8 12.8v70.4c0 6.4 6.4 12.8 12.8 12.8z\" class=\"\"><\/path><\/svg><\/i> <img loading=\"lazy\" decoding=\"async\" width=\"16\" height=\"16\" alt=\"Loading\" src=\"https:\/\/www.borbolycsaba.ro\/ro\/wp-content\/plugins\/page-views-count\/ajax-loader-2x.gif\" border=0 \/><\/p>\n<div class=\"pvc_clear\"><\/div>\n<!-- AddThis Advanced Settings generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>\u00cen toamna acestui an pe drumul jude\u021bean 174A, dinspre comuna Bilbor spre DN15, 2,3 kilometri vor fi asfalta\u021bi din cei 5,8 kilometri neasfalta\u021bi, de la sf\u00e2r\u0219itul covorului asfaltic existent. Achizi\u021bia public\u0103 pentru efectuarea lucr\u0103rilor pe aceast\u0103 por\u021biune a fost \u00eencheiat\u0103, iar contractul se va semna\u00a0 \u00een cur\u00e2nd cu firma c\u00e2\u0219tig\u0103toare. Consiliul Jude\u021bean Harghita, \u00een \u0219edin\u021ba [&hellip;]<!-- AddThis Advanced Settings generic via filter on wp_trim_excerpt --><\/p>\n<div class=\"pvc_clear\"><\/div>\n<p id=\"pvc_stats_556\" class=\"pvc_stats all  \" data-element-id=\"556\" style=\"\"><i class=\"pvc-stats-icon medium\" aria-hidden=\"true\"><svg aria-hidden=\"true\" focusable=\"false\" data-prefix=\"far\" data-icon=\"chart-bar\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 512 512\" class=\"svg-inline--fa fa-chart-bar fa-w-16 fa-2x\"><path fill=\"currentColor\" d=\"M396.8 352h22.4c6.4 0 12.8-6.4 12.8-12.8V108.8c0-6.4-6.4-12.8-12.8-12.8h-22.4c-6.4 0-12.8 6.4-12.8 12.8v230.4c0 6.4 6.4 12.8 12.8 12.8zm-192 0h22.4c6.4 0 12.8-6.4 12.8-12.8V140.8c0-6.4-6.4-12.8-12.8-12.8h-22.4c-6.4 0-12.8 6.4-12.8 12.8v198.4c0 6.4 6.4 12.8 12.8 12.8zm96 0h22.4c6.4 0 12.8-6.4 12.8-12.8V204.8c0-6.4-6.4-12.8-12.8-12.8h-22.4c-6.4 0-12.8 6.4-12.8 12.8v134.4c0 6.4 6.4 12.8 12.8 12.8zM496 400H48V80c0-8.84-7.16-16-16-16H16C7.16 64 0 71.16 0 80v336c0 17.67 14.33 32 32 32h464c8.84 0 16-7.16 16-16v-16c0-8.84-7.16-16-16-16zm-387.2-48h22.4c6.4 0 12.8-6.4 12.8-12.8v-70.4c0-6.4-6.4-12.8-12.8-12.8h-22.4c-6.4 0-12.8 6.4-12.8 12.8v70.4c0 6.4 6.4 12.8 12.8 12.8z\" class=\"\"><\/path><\/svg><\/i> <img loading=\"lazy\" decoding=\"async\" width=\"16\" height=\"16\" alt=\"Loading\" src=\"https:\/\/www.borbolycsaba.ro\/ro\/wp-content\/plugins\/page-views-count\/ajax-loader-2x.gif\" border=0 \/><\/p>\n<div class=\"pvc_clear\"><\/div>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"a3_pvc":{"activated":true,"total_views":1760,"today_views":0},"_links":{"self":[{"href":"https:\/\/www.borbolycsaba.ro\/ro\/wp-json\/wp\/v2\/posts\/556"}],"collection":[{"href":"https:\/\/www.borbolycsaba.ro\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.borbolycsaba.ro\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.borbolycsaba.ro\/ro\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.borbolycsaba.ro\/ro\/wp-json\/wp\/v2\/comments?post=556"}],"version-history":[{"count":2,"href":"https:\/\/www.borbolycsaba.ro\/ro\/wp-json\/wp\/v2\/posts\/556\/revisions"}],"predecessor-version":[{"id":558,"href":"https:\/\/www.borbolycsaba.ro\/ro\/wp-json\/wp\/v2\/posts\/556\/revisions\/558"}],"wp:attachment":[{"href":"https:\/\/www.borbolycsaba.ro\/ro\/wp-json\/wp\/v2\/media?parent=556"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.borbolycsaba.ro\/ro\/wp-json\/wp\/v2\/categories?post=556"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.borbolycsaba.ro\/ro\/wp-json\/wp\/v2\/tags?post=556"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}